Consulting and Safety
Plan Smarter. Operate Safer. Scale with Confidence.Â
Â
What We Do
VSUSA helps warehouses optimize space, improve throughput, and reduce risk—from upfront design to on-floor safety programs. Start with consulting to define the right layout and systems; anchor the plan with OSHA-aligned safety controls and training.

How We Help
Layout & Flow Design
CAD zoning, slotting rules, pick-path and staging optimization.
Risk & Compliance
OSHA/ANSI gap assessments, racking inspections, signage, PPE alignment.
SOPs & Training
Daily checklists, forklift interfaces, spill response, LOTO readiness.
Space Optimization
Re-slotting, high-density storage (VLMs/VCs/racking), ergonomic pick faces.
Equipment Strategy
Right-sizing racking/shelving, VLMs, carousels, guarding, and add-ons.
Phased Roadmaps
Budgeted implementations with measurable targets and timelines.
Our Approach
Step 1: Consult First
Understand goals, SKU profile, labor constraints, and growth plans.
Step 2: Design for Today & Tomorrow
Layouts that support modular automation (AS/RS, VLMs/VCs, AMRs).
Step 3: Build Safety In​
Engineering and administrative controls mapped to OSHA/ANSI with clear SOPs.
Step 4: Execute in Phases
Minimize downtime with a staged plan and ROI checkpoints.
Services Under This Parent Page

Warehouse Consultants
- Discovery & data review, CAD layouts, re-slotting plan
- Equipment + technology strategy (racking, VLMs/VCs, AS/RS paths)
- ROI & implementation roadmap
Explore Warehouse Consultants →

Warehouse Safety
- OSHA/ANSI gap audit, racking inspections, signage plan
- Guarding, traffic management, spill containment, ergonomic upgrades
- SOPs, toolbox talks, KPI & verification cadence
Explore Warehouse Safety →
Frequently Asked Questions (FAQs)
Do we need to buy equipment from you?
No—consulting and safety are standalone. We’ll recommend gear only when it serves the plan.
Â
Can you work remotely?
Yes. We can review data, CAD, and video; site visits as needed.
Â
How long does an engagement take?
Typical baseline plan in 1–3 weeks; phased installs vary by scope.
Â
Which standards do you follow?
OSHA + applicable ANSI/IBC/NFPA and OEM guidance.
Â
Let's Design a Smarter, Safer Warehouse
We’ll assess your facility, produce CAD alternatives, and provide a phased plan with clear ROI—before you commit.


